Integrated Resources Limited Installation team can be called upon as the need requires, We have installed for Huawei Technologies Nigeria Ltd, IBEDC, KAEDC, EKEDP.
Our team are well kitted with PPE and very conversant with the use of HV grouding tool, Crimping tools, such that we have highest numbers of installation in Non-Maximum Demand , LV Meters, High Voltage Maximum Demand, Data Concentrator Unit (DCU) and Distribution Transformer Meters.
Our team are conversant with the use of mobile apps to manage the interface between the installation process and distribution back-end systems.